Revit: Joining Walls to Extend an Opening

If you want to model as you would build, you might find this helpful. Català - Castellano - Deutsch If you want to use Revit for the latest...

Revit: Locking Circles to Reference planes.

How do we lock a circle's center to a reference plane in Revit?. Català - Castellano - Deutsch Locking linear elements to reference pla...

Revit: Converting a Wall Based Family into Face Based Family

Convert a Family that was created as WALL based into a face based family. Català - Castellano - Deutsch I have to apologise for whoever wro...

Some differences between Solibri Model Checker and Navisworks Manage

Just a link to an interesting article ppinting to the things Solibri can do that other moedl aggregators like Navisworks can't. Català -...

MT - Using BIM as a PM Tool: 3.2.2 - Primary Data

Questionnaires were used to gather primary data. The type of primary data necessary for this research was both of quantitative and qualitati...

MT - Using BIM as a PM Tool: 3.2.1 - Secondary Data

We have already seen in previous chapters the potential benefits that BIM can bring to projects, and as a consequence, to Project Manager’s ...

MT - Using BIM as a PM Tool: 3.2 - Data Collection

The necessary data was gathered in the following way. A combination of qualitative and quantitative data was gathered.n Primary data was ga...

MT - Using BIM as a PM Tool: 3.1.2- Inductive Approach

The second part of the research question “How can BIM help Project Managers succeed in delivering complex construction projects" requir...

MT - Using BIM as a PM Tool: 3.1.1 – Part I: Deductive approach

The research methodology begins with a deductive approach. Our initial goal was to test the hypothesis that BIM is an adequate Project Manag...

MT - Using BIM as a PM Tool: 3.1 – Research Philosophy and Approach

For the reasons mentioned on the previous paragraph, the overall research philosophy adopted was that of Critical Realism The combination of...

MT - Using BIM as a PM Tool: 3 Methodology

The author wants to proof with qualitative data that projects managed using BIM achieve better outcomes than comparable ones not using them....

Test on Running an IFC Based Clash Detection using Revit

I tried this and it is not a pleasant process. Català - Castellano - Deutsch So on the series of quick testing clash detection features usi...