MT - Using BIM as a PM Tool: 4.2.2 – BIM influence on Time/Schedule

The second KPI with higher positive effect results of using BIM is “Time reduction or Control”. The effect of using BIM showed a positive effect on 34% of the projects (12 out of 35).

Show me more...

MT - Using BIM as a PM Tool: 4.2.1 – BIM influence on Cost

The results show clearly that the “Cost Reduction or Control” is the KPI that more often was seen as receiving a positive effect of using BIM.
Show me more...

MT - Using BIM as a PM Tool: 4.2 Findings from the Case Studies

It is important to highlight here that the approach taken to quantify the number of projects in which a KPI had positive effects was conservative in nature.
Show me more...

MT - Using BIM as a PM Tool: 4.1 Results from Case Studies

Several case studies were collected from existing literature to analyze in which areas the application of BIM had improved aspects of the projects studied.

Show me more...

MT - Using BIM as a PM Tool: 4. – Secondary Data Results and Findings

Following the methodology explained in the previous chapter, primary and secondary data needed for the research was gathered. This chapter will show the results and findings derived from the collection of secondary data.
Show me more...

AutoCAD Find and replace text

Find and replace texts in your CAD File. no need to enter edit each one of them
Show me more...

Presentation of the Spanish BIM Users Guide

Video Presentation of the Spanish BIM Guide Sponsored by BuildingSMart Spanish Chapter
Show me more...

Revit: Joining Walls to Extend an Opening

If you want to model as you would build, you might find this helpful.
Show me more...

Revit: Locking Circles to Reference planes.

How do we lock a circle's center to a reference plane in Revit?.
Show me more...

Revit: Converting a Wall Based Family into Face Based Family

Convert a Family that was created as WALL based into a face based family.
Show me more...

Some differences between Solibri Model Checker and Navisworks Manage

Just a link to an interesting article ppinting to the things Solibri can do that other moedl aggregators like Navisworks can't.
Show me more...

MT - Using BIM as a PM Tool: 3.2.2 - Primary Data

Questionnaires were used to gather primary data. The type of primary data necessary for this research was both of quantitative and qualitative matter.
Show me more...